Aros has the track record: 600+ vessels outfitted, 700+ people, 55+ locations, revenue from €1M in 2011 to €159M in 2024-2025. The problem is not credibility, it is timing and reach. Refit and outfitting scopes get decided in a window, months before drydock. If nobody from Aros speaks to the technical decision-maker inside that window, the scope goes to whoever was in the room. We find ships with a reason to do work, work out roughly when the work has to happen, find the person who signs it off, and put Aros in front of them before the scope is handed out. Email + LinkedIn multichannel. Replies route into your CRM.
Wonder of the Seas. Disney Wish. MSC Virtuosa. Celebrity Apex. The Hurtigruten fleet. Aros has already done the work at the top of this market. You do not need to convince buyers you can deliver. You need to be in the room when the next scope is written, on a technical superintendent’s desk, 6 to 18 months before drydock.
A fleet technical superintendent will never reply to “buy our outfitting.” They reply when someone contacts them about a specific vessel with a specific finding they are already dealing with, or a drydock they are already planning. Felt problem, in their language, not a feature list.
Port State Control publishes deficiencies on every ship they inspect. Class societies publish survey schedules. Trade press announces refit programmes. Every one is a dated reason to plan work, and every one maps to something Aros already does: interior, HVAC, piping, electrical, furniture, full turnkey.
Aros is not a hard sell once the technical director is at the table. A team that works “in the environments most contractors avoid: compressed drydock windows, active vessels, simultaneous multi-system scopes, and deadlines that do not move.” Your words. Our job is to get the right director to that table.
~450–500 active cruise + expedition vessels worldwide
~1,800–2,300 active ferry + RoPax + river cruise vessels
info@ addresses. Every message goes to the actual technical decision-maker in their language.| Signal | Source | Temp | Why it matters for Aros |
|---|---|---|---|
| Signal 1 · Port State Control deficiencies in Aros scope (fire safety, ventilation, crew accommodation, structural, piping) | Paris MoU + Tokyo MoU + USCG inspection records | High-intent | Every deficiency has a deadline. Fire safety, HVAC, cabin condition, piping — all core Aros scope. We reference the vessel and the finding, not accuse it. |
| Signal 2 · Survey or drydock window coming (5-year class-renewal cycle + drydock interval) | Class registers (DNV, LR, ABS, BV, RINA) + Equasis + trade press | Timing | Refit scopes get written 6–18 months before drydock. We derive the window from build year + last known dock + class cycle, then reach in during planning. |
| Composite · deficiency + drydock window | Signal 1 cross-referenced with Signal 2 | Highest | A ship with an open deficiency in Aros scope and a drydock window coming. Documented reason to do work, fixed date to do it in. First list we bring to the call. |
| New refit programme or yard booking announced | Trade press: Cruise Industry News, Splash247, TradeWinds | Timing | Public confirmation a scope is being written right now. Reach in before the RFP goes out. |
| Newbuild order placed at a yard where Aros already works | Yard announcements, shipbuilding trade press | Timing | Newbuild outfitting gets subcontracted. Aros is at the big three. Second-tier packages are open. |
| New Technical Director / Head of Refit / Head of Newbuilding | LinkedIn Sales Nav + PredictLeads hire events | Timing | A new leader in the seat wants a visible win in their first 90 days. Warmest cold conversation in the industry. |
| Open roles: refit engineer, drydock planner, outfitting manager | TheirStack, company career pages | Timing | The scope pressure is showing right now, in their own job post. |
| Attendee at Seatrade / SMM / Nor-Shipping / Cruise Ship Interiors | Event exhibitor + attendee lists | High-fit | Pre-book meetings before the floor opens. See the events section. |
| Website de-anonymisation | RB2B / Vector / Koala pixel on arosmarine.com | High-intent | See which operators browse your reference pages and services. Capture demand already generated. |
| CRM reactivation | Your CRM: past quotes, dormant relationships | High-fit | The cheapest pipeline in the system. Re-engage warm history from prior scopes. |
Each flagged vessel is enriched across sources until we can answer what matters:
info@)?Fit: right segment, right size band, an ownership / management structure Aros can serve, in a geography where you can mobilise.
Intent: how hot is the moment? A ship with a deficiency + a drydock window outranks either signal alone. A newbuild order at Meyer or Chantiers outranks a routine refit.
Right ship, real trigger. Handed over with the vessel name, the finding or the drydock window, the class society, the operator, and the exact opener — ready for the technical director’s inbox.
Right operator, no live trigger yet. Kept warm with useful touches until a deficiency, a survey window or a hire moves them to A.
Cargo vessels, tankers, offshore rigs, ships outside your served segments, existing clients, live tenders. Filtered out automatically before enrichment.
Cruise and ferry interiors are drawn by a small handful of studios. When Aros is on their preferred-contractor list, you get called into scopes before the RFP. We map principals, package leads and project managers at:
Class societies advise operators on drydock planning and vet the shortlist of outfitting contractors. Where Aros is on the approved list, we make sure the class society’s newbuild and refit team knows your capacity by yard, service line and window:
Association membership opens directory access to whole fleets at once and warms every outreach. Co-branded content or a member webinar earns endorsed distribution across the roster:
You have Royal Caribbean, MSC, Disney, Hurtigruten. Cruise and ferry executives move between operators and know each other. A single endorsed introduction inside this network is worth months of cold outreach. We build the referral loop:
We pull the exhibitor and attendee lists. Find the technical, newbuild, refit and procurement people. Build the target list against your ICP + the four channel partner categories above.
Aim at meetings, not awareness. Point everything at your existing “meet us live at” page. Two weeks before, we chase the maybes and hand your team a schedule.
Live follow-up on no-shows and walk-ups. After the show, everyone on the list gets followed up whether they met you or not. The whole list rolls into the evergreen engine so it keeps working.
Two clean options instead of a five-tier ladder. Evergreen (€5,000) for always-on reach across every operator, manager, owner and yard. Signal Outreach (€7,000) for the two custom watchers built for Aros. Run both together for €10,000 and save €2,000 versus buying them separately — and a warm caller is bundled in at no extra cost. They work better together anyway: the evergreen list makes the signal outreach warm, and the warm caller qualifies every engaged lead before it hits your BD team’s calendar.
Full pre-show, on-show and post-show campaign per event. Not always-on. Billed only when you exhibit or attend.
Aros scopes are not small. Refit packages, cabin builds, HVAC retrofits, full turnkey outfitting jobs run from tens of thousands to several hundred thousand euro depending on scope.
Set that next to the fee. A year of the full programme (€10k × 12 = €120k) is a fraction of a single mid-sized project. So we do not need to fill your pipeline with fifty deals. We need to put Aros in front of the right technical director at the right moment, and win one. That single win covers the whole engagement. Everything after it is margin on spend you have already paid.
Give us your average project value and win rate on quoted scopes, and this stops being “a fraction” and becomes a real number.